National Emergency Hotline: 911 Join UsAboutOfficial Aborlan Website
BetterAborlanA community-run portal for AborlanSearch

Infrastructure

Building Permit

Permit for new construction or renovation.

  • Fee: Based on the National Building Code of the Philippines (PD 1096) — varies by project
  • Processing time: 1 hour 20 minutes (office processing after all required endorsements are secured)
  • Office: Municipal Engineering Office (MEO)
View Details

Occupancy Permit

Required before a completed building or structure can be used or occupied, or when its use/occupancy classification changes.

  • Fee: Based on the National Building Code of the Philippines (PD 1096) — varies by project
  • Processing time: 1 day, 1 hour, 7 minutes
  • Office: Municipal Engineering Office (MEO)
View Details

Zoning Clearance

Required clearance confirming a proposed structure or business location complies with the municipality's zoning plan.

  • Fee: Based on the 2018 Revenue Code — varies
  • Processing time: 3 days, 53 minutes
  • Office: Municipal Planning and Development Office (MPDO)
View Details

Approved Project Brief / Feasibility Study

Review and approval of a project brief or feasibility study for proposed local development projects.

  • Fee: Pending verification
  • Processing time: 12 days, 1 hour, 13 minutes
  • Office: Municipal Planning and Development Office (MPDO)
View Details

MPMC Project Inspection Report

Inspection report issued by the Municipal Project Monitoring Committee for ongoing local projects.

  • Fee: Pending verification
  • Processing time: 10 days, 30 minutes
  • Office: Municipal Planning and Development Office (MPDO)
View Details

New Water Connection

Apply for a new household or commercial water service connection.

  • Fee: ₱1,500.00
  • Processing time: 1 day, 1 hour, 8 minutes
  • Office: Aborlan Water System Management and Operation Unit (AWSMOU)
View Details

Water Billing

Monthly water bill payment. A 10% surcharge applies if paid after the due date.

  • Fee: Based on metered usage
  • Processing time: 8 minutes
  • Office: Aborlan Water System Management and Operation Unit (AWSMOU)
View Details

Water Service Disconnection

Disconnection of water service, typically due to unpaid arrears.

  • Fee: Pending verification
  • Processing time: 2 days, 10 minutes
  • Office: Aborlan Water System Management and Operation Unit (AWSMOU)
View Details

Water Service Reconnection

Reconnection of a previously disconnected water service.

  • Fee: ₱250.00
  • Processing time: 1 day, 8 minutes
  • Office: Aborlan Water System Management and Operation Unit (AWSMOU)
View Details