Infrastructure
Building Permit
Permit for new construction or renovation.
- Fee: Based on the National Building Code of the Philippines (PD 1096) — varies by project
- Processing time: 1 hour 20 minutes (office processing after all required endorsements are secured)
- Office: Municipal Engineering Office (MEO)
Occupancy Permit
Required before a completed building or structure can be used or occupied, or when its use/occupancy classification changes.
- Fee: Based on the National Building Code of the Philippines (PD 1096) — varies by project
- Processing time: 1 day, 1 hour, 7 minutes
- Office: Municipal Engineering Office (MEO)
Zoning Clearance
Required clearance confirming a proposed structure or business location complies with the municipality's zoning plan.
- Fee: Based on the 2018 Revenue Code — varies
- Processing time: 3 days, 53 minutes
- Office: Municipal Planning and Development Office (MPDO)
Approved Project Brief / Feasibility Study
Review and approval of a project brief or feasibility study for proposed local development projects.
- Fee: Pending verification
- Processing time: 12 days, 1 hour, 13 minutes
- Office: Municipal Planning and Development Office (MPDO)
MPMC Project Inspection Report
Inspection report issued by the Municipal Project Monitoring Committee for ongoing local projects.
- Fee: Pending verification
- Processing time: 10 days, 30 minutes
- Office: Municipal Planning and Development Office (MPDO)
New Water Connection
Apply for a new household or commercial water service connection.
- Fee: ₱1,500.00
- Processing time: 1 day, 1 hour, 8 minutes
- Office: Aborlan Water System Management and Operation Unit (AWSMOU)
Water Billing
Monthly water bill payment. A 10% surcharge applies if paid after the due date.
- Fee: Based on metered usage
- Processing time: 8 minutes
- Office: Aborlan Water System Management and Operation Unit (AWSMOU)
Water Service Disconnection
Disconnection of water service, typically due to unpaid arrears.
- Fee: Pending verification
- Processing time: 2 days, 10 minutes
- Office: Aborlan Water System Management and Operation Unit (AWSMOU)
Water Service Reconnection
Reconnection of a previously disconnected water service.
- Fee: ₱250.00
- Processing time: 1 day, 8 minutes
- Office: Aborlan Water System Management and Operation Unit (AWSMOU)